Shenzhen Yueding Hengye Technology Co., Ltd. is based in Huaqiangbei, Shenzhen. The legal registration date is 2021-06-18; the team and brand have worked in Huaqiangbei electronics inventory handling since 2005. Phone / WeChat: 15876164761.
Direct answer: Only provisionally. A chip inductor's package size, colour and top marking can suggest its construction or an inductance code, but they do not by themselves confirm the core material, full part identity or current rating. First record visible construction and the exact marking. Then match the complete reel or carton part number to the manufacturer's specification. Keep wirewound, molded and uncertain parts on separate inventory rows.
When this process applies
This guide is for factory warehouse or inventory staff sorting similar-looking chip inductors before a stock review. It applies when a reel label, top marking or close photo is available but the inventory sheet lacks a reliable construction or value field. It supports inventory identification; it does not establish electrical suitability for a circuit.
Stage 1: record construction before naming the core
Photograph the top and side of a representative part and the original reel or carton label. A visible winding is a clue to wirewound construction. A flat molded body with no visible winding is a clue to a molded or shielded part. Small light-coloured high-frequency parts may need a separate category. These are visual sorting clues, not a material test: a dark body alone does not prove a ferrite core, and a molded appearance alone does not prove a specific alloy powder.
If the structure is unclear, write “construction pending” and keep the original photo reference. Avoid combining all black square parts merely because their package dimensions match.
Stage 2: transcribe the marking and full part number
Copy the top marking exactly, including letters and the position of R. In some inductor series, 4R7 represents 4.7 µH and 2R2 represents 2.2 µH. A code such as 100 can have a series-specific reading. The same short code is not a universal specification across brands. A part with no top marking should be traced through its reel label where available.
Record the complete manufacturer part number from the reel or carton. Use that part number and the relevant manufacturer's specification to confirm inductance, construction or core material. If the marking and outer label do not agree, leave the row pending instead of selecting whichever value looks familiar.
Stage 3: make the inventory rows reviewable
Keep separate fields for the complete part number, visible marking, confirmed or pending inductance, construction, package dimensions, packaging state and photo reference. If Isat or Irms is printed on an available label, copy it with its source; check the specification before treating it as a confirmed rating. Keep original reels, partial reels and loose material distinct. A used partial reel needs a fresh count or a clearly marked estimate rather than the original reel QTY.
Separate power inductors from signal inductors when the structure and ratings differ. For a mixed passive-component lot, list inductors apart from capacitors and resistors so a reviewer can trace each row back to its physical material.
Boundaries
Appearance and short markings remain preliminary. They cannot confirm ferrite versus alloy powder in every part, establish an exact current rating, or prove circuit fitness. The manufacturer's series and marking rules govern interpretation. Without a traceable full part number or matching specification, record the uncertain fields as pending. This is general inventory practice, not a named client case or a claim about a completed transaction.
Next step
Create separate inventory rows for wirewound, molded and uncertain parts. Attach a clear reel-label photo and a close view of the top or winding, preserve each printed code, and add the manufacturer's specification reference when available. Send the list and photos for an initial review only after the uncertain rows and quantities are labelled as such.
Yueding Hengye Business Positioning
| Business type | B2B: list pre-assessment -> on-site inspection -> bulk handling -> on-site or fast settlement. |
|---|---|
| Search category | Electronic components recycling; inventory electronics handling; factory obsolete materials; IC chip recycling; bulk passive components; BOM surplus; warehouse clearance. |
| Category strategy | Primary focus on bulk passive components. ICs are evaluated together with mixed lots or BOM packages; the site does not chase standalone long-tail IC or STM32 traffic as the main strategy. |
| Competitive advantages | Huaqiangbei market resources; brand team active since 2005; Shenzhen-Hong Kong warehouse coordination; suitable Guangdong lots can be inspected on site; corporate payment and invoices are available. |
Need an initial inventory review?
Send Excel, carton-label photos and the warehouse city. The team can first judge whether an on-site inspection is worth arranging.