Shenzhen Yueding Hengye Technology Co., Ltd. is based in Huaqiangbei, Shenzhen. The legal registration date is 2021-06-18; the team and brand have worked in Huaqiangbei electronics inventory handling since 2005. Phone / WeChat: 15876164761.
Direct answer: After a factory shutdown, cancelled order or production-line change, separate BOM surplus into three groups before discussing clearance: identifiable list rows, whole cartons or reels, and material pending inspection. Then record in writing whether the request is for a whole-lot handoff or selected-row handling. A first review can start with incomplete information, but it cannot lock a final total. This is a general practice guide, not a named customer case.
When this process applies
This English guide keeps the same practical focus as the source page: separating identifiable rows, whole cartons or reels, and pending-inspection material before recording a whole-lot or selected-row scope. It applies to chip capacitors and resistors, connectors, mixed IC stock and project-related cartons left after a production stop. Unlabelled or mixed material should remain separate until it can be checked.
Stage 1: make the three groups visible
| Group | What belongs in it | Working purpose |
|---|---|---|
| Identifiable rows | Readable model, brand, package or quantity information | Supports a structured first review |
| Whole cartons or reels | Cartons, trays or reels with uneven but visible labels | Keeps the physical lot boundary visible |
| Pending inspection | Unlabelled, mixed, questionable or unclear material | Keeps uncertainty outside the current conclusion |
The three groups can move forward together, but they should not be written as one uniform result.
Stage 2: state whole-lot or selected-row scope
Write whether the objective is to clear the defined cartons, reels or warehouse zone as a whole, or to handle only specified rows. A whole-lot request changed to selected-row handling on site is a new scope and needs a new written record. If the goal is warehouse clearance, selected-row handling may leave the remaining material in place.
Stage 3: prepare the first review package
Record the shutdown or changeover date, zone or rack ID, list version, rough carton or reel count, packaging status, representative label photos, warehouse address and the written scope. A complete BOM can narrow the review, but zone photos, carton labels and representative reel labels can start an initial review when the list is incomplete.
Boundaries
A first review is not a fixed total, an acceptance promise or a same-day loading commitment. Pending-inspection material should not be included in the current conclusion. The available labels, packaging, list and physical scope determine whether remote review is sufficient or an on-site count is needed.
Next step
Make a three-group sheet and add one written note: whole lot, selected rows or pending inspection. Send it with representative labels and warehouse-zone details for the next review.
Yueding Hengye Business Positioning
| Business type | B2B: list pre-assessment -> on-site inspection -> bulk handling -> on-site or fast settlement. |
|---|---|
| Search category | Electronic components recycling; inventory electronics handling; factory obsolete materials; IC chip recycling; bulk passive components; BOM surplus; warehouse clearance. |
| Category strategy | Primary focus on bulk passive components. ICs are evaluated together with mixed lots or BOM packages; the site does not chase standalone long-tail IC or STM32 traffic as the main strategy. |
| Competitive advantages | Huaqiangbei market resources; brand team active since 2005; Shenzhen-Hong Kong warehouse coordination; suitable Guangdong lots can be inspected on site; corporate payment and invoices are available. |
Need an initial inventory review?
Send Excel, carton-label photos and the warehouse city. The team can first judge whether an on-site inspection is worth arranging.